This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Cookie settingsACCEPT
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities...
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Non-necessary
Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.
SAVE & ACCEPT
    • Latest News
    • Politics
    • Transport
    • Lifestyle
    • Community
    • Business
    • Crime
    • Environment
    • Health
    • Education
    • Sport
    • Harrogate
    • Ripon
    • Knaresborough
    • Boroughbridge
    • Pateley Bridge
    • Masham
  • What's On
  • Offers
  • Newsletter
  • Podcasts

Interested in advertising with us?

Advertise with us

  • News & Features
  • Your Area
  • What's On
  • Offers
  • Newsletter
  • Podcasts
  • Latest News
  • Politics
  • Transport
  • Lifestyle
  • Community
  • Business
  • Crime
  • Environment
  • Health
  • Education
  • Sport
Advertise with us
Subscribe
  • Home
  • News
  • Health

We want to hear from you

Tell us your opinions and views on what we cover

Contact us

Register for our newsletter

Free Newsletter Sign Up

Join now
Connect with us
  • About us
  • Correction and complaints
Download on App StoreDownload on Google Play Store
  • Website Terms & Conditions
  • Subscription Terms & Conditions
  • Privacy Statement
  • Comments Participation T&Cs
Trust In Journalism

Copyright © 2020 The Stray Ferret Ltd, All Rights Reserved

Site by Show + Tell

Thank you for your interest in this story

To continue reading this article, sign up today to unlock exclusive content and be part of our community discussions

  • Exclusive discounts
  • Enjoy commenting on local issues

Already a subscriber? Log in here.

30

Mar 2022

Health
Health

Work on Harrogate Hydro and Knaresborough leisure centre to start next month

Published: 30 Mar 2022, 15:26 BST

by Calvin Robinson

Comment

0

Two major projects to refurbish the Harrogate Hydro and build a new leisure centre at Knaresborough look set to get underway next month.

hydro-swimming-pool-3
The Hydro's 'drum' entrance would be demolished and replaced.

Two major projects to renovate Harrogate Hydro and build a new leisure centre in Knaresborough will get underway next month.

Harrogate Borough Council is behind the plans which will cost around £28 million and see the construction works carried out by Bristol-based firm Alliance Leisure.

The Hydro will get an £11.8 million investment, including a two-storey extension of the building, as well as a new entrance, cafe and reception area.

There will also be a new diving board structure, fitness suite and refurbished changing areas.

The venue will close on April 8 and the project will be phased to allow for the pool hall area to be brought back into use “as soon as possible in early 2023,” the council said.

It also said it anticipated all of the works will be completed by April 2023.




Read more:



  • Ripon leisure centre named after local Olympic hero Jack Laugher

  • £28m contracts for new Knaresborough pool and Harrogate Hydro upgrades approved

  • Harrogate Hydro set to close for nine months






Meanwhile, some grounds works are already underway at Fysche Field in Knaresborough where a new £17 million leisure centre complete with a six-lane pool, health spa and fitness studios will be built as a replacement for the existing Knaresborough Pool.

It will be built behind the existing pool which will remain open during the works before being demolished.

The council said the new leisure centre will take 65 weeks to build with completion in July 2023.

After this, the demolition works will take a further 15 weeks with completion in October 2023.

Knaresborough leisure centre

Proposals for the Knaresborough Leisure Centre.



These proposals were approved last month despite concerns over the environmental impact of demolishing a large building to replace it with another.

However, Jonathan Dunk, chief development officer at the council, described the 30-year-old Knaresborough Pool as “at the end of its working life” and said more swimming space was needed for the town’s growing population.

He previously said: 

“We need to renew rather than refurbish the existing facility because it is old and there is inadequate water space.
“We also want to upgrade to make the most of the energy performance of the new building.”


In Ripon, the opening of the city’s new multi-million pound swimming pool was finally celebrated on 2 March after months of costly delays.

The project was nine months overdue and £4 million over budget, and refurbishment works on the adjoining Ripon Leisure Centre are still underway after the discovery of an underground void prompted the need for an investigation.

The investigation by engineering firm Stantec was due to finish earlier this month and a report setting out what reinforcement works will be required will now follow.

Stantec previously suggested there had been a “significant deterioration” of the ground beneath the older half of the leisure centre and that strengthening works could include steelworks, thickened floors and grouting – the same method “successfully” used to stabilise the new pool.